[用电负荷预测]要根据电网的[用电负荷特性],充分考虑各种因素;[用电负荷预测结果]应达到一定精度;[用电负荷预测]的对象很多,应根据实际需求,对不同的对象有重点的进行预测;[用电负荷预测]要用科学的方法,根据不同的预测对象,建立一定的数学模型;[用电负荷预测]是电力系统[安全经济运行]和[电网规划]不可缺少的组成部分;[用电负荷预测]应深入分析研究[用电负荷特性]和[变化规律],努力提高[用电负荷预测准确率]。

偶把主要专业词部分划出来..应该好懂一些了吧...专业词你就甭管了..

小楼昨夜听雨声, 竹兰幽幽入梦来。

TOP

反正一半先给你了,剩下一半等我灵光一现再说~
P图素材 就在这里

TOP

呵呵...
小楼昨夜听雨声, 竹兰幽幽入梦来。

TOP

偶个人整理了一下,有错误处大家改正:

[Abstract] The forecast technology of electro-load requires taking into account various factors according to electro-load features of the electricity grid. The result of electro-load forecast should be put into a certain degree of accuracy. Since there can be lots of objects of electro-load forecast, different focuses are to be concentrated on to meet the actual needs when the forecast is being carried out. Electro-load forecast  needs to use scientific methods establishing mathematical model according to different forecast objects. Electro-load forecast is an indispensable component in safety and economic operation of electric-power system and the electricity grid plans. Electro-load forecast should analyze the features and the law of  the load in detail and should try hard to improve the accuracy of  the load forecast.

 

关键词:用电负荷;用电负荷预测;预测技术;影响因素

[Keywords] electro-load, electro-load forecast,forecast technology, influence factor

小楼昨夜听雨声, 竹兰幽幽入梦来。

TOP

It seems QQ's more convenient for talking abt it.
well, Good luck u roving cats' Queen~~
---Am back. Buddies, how r u doing?---

TOP

哈哈,差不多就这样了
P图素材 就在这里

TOP